Record of Proceedings 26-06-2024
Public Notice in O.P.No.17 of 2024
Order passed on Load Forecasts Resource Plans and State Electricity Plan for 5th Control Period FY2024-25 to FY2028-29 and 6th Control Period FY2029-30 to FY2033-34.
Orde rin OP No.29 of 2024
Record of proceedings dated 03-07-2024
Record of proceeding 10-07-2024
Order on OP No.6 of 2024
Record of Proceedings 24-07-2024
Draft 5th Amendment to APERC SoP Regulation 2004
Public Notice for draft 5th amendment APERC SOP Regulation 2004 dt. 26.07.2024
Order in OP No.26 amp 27 of 2024 dt.24-7-2024
Order in OP No.61 of 2023 dt.24-7-2024
Order No 53 of 2023 dated 06-08-2024
Transmission Tariff order for the period FY2024-25 to FY2028-29
Press note dated 06-08-2024 on Transmission Tariffs for the 5th Control Period from FY 2024-25 to FY 2028-29
Record of Proceedings 07-08-2024
Order passed in OP.No. 4 of 2024 dated: 07-08-2024
Letter to GoAP application by APRAPSCOM for GNA to commence 7000MW SECI Power
Record of Proceedings 14-08-2024
Order in OP No 21 of 2020 dated 20.08.24.
MYT Order on SLDCs charges for the 5th Control Period FY2024-25 to FY2028-29
Press Note-MYT SLDC Order on SLDCs charges for the 5th Control Period FY2024-25 to FY2028-29
Regulation 6 of 2024 Fifth Amendment to Andhra Pradesh Electricity Regulatory Commission Licensees Standards of Performance Regulation 2004. Regulation No. 7 of 2004
Record of Proceedings 28-08-2024
Order in OP No. 30 of 2024 dt 28-08-2024
Order in OP 82 of 2023 dated 03.09.2024
Clarification regarding the procedure for calculating electricity units exported by Solar Net Meter consumers during periods when the meter is defective
Licensees Automatic compensation details for FY 2022-23
Licensee s Automatic compensation details for FY 2023-24
SUO MOTU ORDER 1 of 2024 In the matter of determination of Variable Cost for the period from 01-04-2024 to 31-03-2029 in respect of the existing Biomass Industrial Waste and Bagasse based plants