Order passed on Load Forecasts Resource Plans and State Electricity Plan for 5th Control Period FY2024-25 to FY2028-29 and 6th Control Period FY2029-30 to FY2033-34.
Orde rin OP No.29 of 2024
Order on OP No.6 of 2024
Order in OP No.26 amp 27 of 2024 dt.24-7-2024
Order in OP No.61 of 2023 dt.24-7-2024
Order No 53 of 2023 dated 06-08-2024
Transmission Tariff order for the period FY2024-25 to FY2028-29
Order passed in OP.No. 4 of 2024 dated: 07-08-2024
Order in OP No 21 of 2020 dated 20.08.24.
MYT Order on SLDCs charges for the 5th Control Period FY2024-25 to FY2028-29
Press Note-MYT SLDC Order on SLDCs charges for the 5th Control Period FY2024-25 to FY2028-29
Order in OP No. 30 of 2024 dt 28-08-2024
Order in OP 82 of 2023 dated 03.09.2024
SUO MOTU ORDER 1 of 2024 In the matter of determination of Variable Cost for the period from 01-04-2024 to 31-03-2029 in respect of the existing Biomass Industrial Waste and Bagasse based plants
Order in OP 82 of 2023 dated 03.09.2024
MYT Order of AP GENCO for the 5th Control Period FY2024-25 to FY2028-29
Press Note dated 09.09.24 on Multi-Year Order on the Determination of Tariffs of APGENCO Generating stations for the 5th Control period FY2024-25 to FY2028-29
Order in OP No.4 of 2023 dated11-9-2024
Determination of Pooled Cost of Power Purchase for FY 2022-23 to be considered for FY 2023-24 under the Renewable Power Purchase Obligation Compliance by Purchase of Renewable Energy/Renewable Energy Certificates Regulation 2022 Regulation 5 of 2022
MYT Order for Wheeling Business for the 5th Control Period from FY 2024-25 to FY 2028-29
Press Note on Multi-Year Order on the Determination of Wheeling Tariffs of DISCOMS rsquo s network for the 5th Control period FY2024-25 to FY2028-29
Order in O.P.No. 37 38 39 41 and 42 of 2024
Order Review IA No.1of 2024 in OP No. 40 of 2020 dt.25-09-2024
Order in OP No.53 of 2024 dt.25-09-2024
Order in OP No.31 of 2024 dt.25-09-2024
Order in OP No 32 33 34 35 and 36 of 2024 dt.25-09-2024